Construction of a cover for recycling center with installation of a textile membrane mounted on a mixed glulam and galvanized steel frame.
The posts are in galvanized steel and the frame is in glued laminated wood.
Rainwater recovery at the foot of poles in a buried network.
Traditional foundations.
COMPLETION DATE
2018
SURFACE AREA
577 m²