WATER TREATMENT PLANT – GRENOBLE (FRANCE)

Location GRENOBLE (38)
COMPLETION DATE 2013
SURFACE AREA 1400 M2

AQUAPOLE waste water treatment plant.

Construction of a water treatment plant of a surface area of 1404m². Steel structure covered by a textile membrane.