CLIMBING HALL – POLLIONNAY (FRANCE)

Location POLLIONNAY (69)
COMPLETION DATE 2015
SURFACE AREA 420 M2

Construction of a 330m² climbing hall and 80m² changing rooms in timber construction. The hall is built on the basis of a glue-laminated timber frame with wall filling and timber frame boxes.

The peripheral exterior cladding is wood and laminated panelling, including metal finish flashings and exterior joinery.