Construction of a 330m² climbing hall and 80m² changing rooms in timber construction. The hall is built on the basis of a glue-laminated timber frame with wall filling and timber frame boxes.
The peripheral exterior cladding is wood and laminated panelling, including metal finish flashings and exterior joinery.
COMPLETION DATE
2015
SURFACE AREA
420m2